[DC.COMPUTER] Layer 4 · Hyperscaler · San Antonio, TX

Azure South Central US

Microsoft Azure-operated Hyperscaler facility in San Antonio, TX, USA.

[AI Summary]

Azure South Central US is a hyperscaler datacenter in San Antonio, TX, USA, operated by Microsoft Azure. The site carries 500 MW of IT load, deploys H100/B200/GB200, and runs at a measured PUE of 1.18.

Operator
Microsoft Azure
Tier
Hyperscaler
City
San Antonio, TX, USA
Region
NA
Power (MW)
500 MW
GPU fleet
H100/B200/GB200
PUE
1.18
Coordinates
29.42, -98.49
[Facilities · 8]
FacilityOperatorLocationGPUMWPUE
Azure East USMicrosoft AzureBoydton, VA, USAH100/B2007001.17
Azure West US 3Microsoft AzureGoodyear, AZ, USAH100/MI300X4501.19
Azure West EuropeMicrosoft AzureMiddenmeer, NetherlandsH100/B2003501.16
Azure Japan EastMicrosoft AzureTokyo, JapanH100/B2002201.24
Azure Hong KongMicrosoft AzureHong Kong, Hong KongH100901.40
Azure UAE NorthMicrosoft AzureDubai, UAEH100901.32
Azure Mexico CentralMicrosoft AzureQuerétaro, MexicoH100801.28
Azure West US 2Microsoft AzureQuincy, WA, USAH100/B2006001.12
[Knowledge Graph]

Company → Datacenter → GPU → Customer → Industry

Every entity on this site is cross-linked. Follow the graph from operators down to specific facilities, GPU clusters, customers, and sectoral context.